The Pennsylvania Department of Transportation and its consultants have designed an estimated $34 million project to keep “the bathtub” dry most of the time and prevent the Monongahela River from overflowing onto the Parkway East in Downtown Pittsburgh.
Beginning after the National Football League draft in April next year, the department will reconstruct the flood wall along the Monongahela Wharf between Grant Street and the Fort Pitt Bridge. The project will increase the height of the flood wall by as much as 5 feet to reduce the amount of water that can block the roadway for 40,000 to 70,000 drivers a day.
… Every time the bathtub floods, it creates a traffic nightmare in Downtown Pittsburgh because all inbound traffic has to get off the Parkway East at Grant Street or earlier and weave its way through the Golden Triangle to make a different connection with the Fort Pitt or Fort Duquesne bridges. After the water stops rising, it takes PennDOT crews a minimum of 12 hours to pump out the water and haul away the mud and debris at an average cost of $100,000 each occurrence.